Inside the Briefcase

How to align your visual brand guidelines and create consistently on-brand content

How to align your visual brand guidelines and create consistently on-brand content

In this ebook, we’ll explore the various themes leading...

Your B2B Content Strategy in 2017: How To Think Like A Movie Studio + 6 Other Tactics

Your B2B Content Strategy in 2017: How To Think Like A Movie Studio + 6 Other Tactics

Jon Lombardo, Creative Lead, LinkedIn, reveals in this presentation...

2017 State of Technology Training

2017 State of Technology Training

Pluralsight recently completed an in-depth survey of 300 enterprises...

IT Briefcase Exclusive Interview: Keeping Your (Manufacturing) Head in the Clouds

IT Briefcase Exclusive Interview: Keeping Your (Manufacturing) Head in the Clouds

with Srivats Ramaswami, 42Q
In this interview, Srivats Ramaswami,...

IT Briefcase Exclusive Interview: New Solutions Keeping Enterprise Business Ahead of the Game

IT Briefcase Exclusive Interview: New Solutions Keeping Enterprise Business Ahead of the Game

with Sander Barens, Expereo
In this interview, Sander Barens...

Case Study:Ausclad Responds to Energy Demands with Virtualization

November 12, 2010 No Comments

The Aucsland Group had been growing fast. An energy boom in the Pacific Rim had created new demands for the company and its various operations that included engineering and manufacturing and construction for the oil and gas industries.

As the company grew, it needed to place more emphasis on its IT resources. It needed to expand its server room or move it entirely.

Click here to view this Case Study

DATA and ANALYTICS , Featured White Papers

Leave a Reply

(required)

(required)


ADVERTISEMENT

IBC 2017

ITBriefcase Comparison Report